Mirus Cel - Tecma X-light Manuel D'installation Et Maintenance

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Operation/installation/service manual
Manuale di utilizzo / installazione / manutenzione
X-light / Privilege / Evolution / Breeze / E-Breeze / Silence Plus / Elegance / Saninautico / Prestige
D – RED
E – BLACK
F + G almost full signal for the control panel
F – WHITE
G – GREEN
STA installation recommendations:
- Do not connect it if the almost full (¾) level is not required.
- Protect all connections from corrosion
-A, B, and C is the input voltage (from the collection tank)
-D, E, F, and G is the output voltage (towards the control unit)
- If no sensors are installed, only connect D+E to the control unit
- If STA is near the tank, it is possible to extend wires D, E, F, and G up
to 40 m *
- If STA is near the toilet, it is possible to extend wires A, B, and C up
to 100 m *
- When properly connected, the LED light "CONNECTED" will flash
* It always depends on the type of electrical system configuration
WARNING: In order to run properly, the control unit
of the premium control panel must always have a level sensor
connected for 4/4 or STA (D+E wire).

3.5.2 Mirus Cel

These sensors only run with the premium control unit. They can be attached outside of the
blackwater tanks (max thickness of 10 mm).
 Full Tank Sensor
 Mid Tank Sensor – Optional
- Use isopropyl alcohol (not included) to clean the side of the tank at the top - approximately on the
left-right centreline where the sensor will be mounted. When thoroughly clean and dry, firmly press
www.thetfordmarine.com
Manual rev 25.2014
TECMA SRL – Via Flaminia / Loc Castel delle Formiche/ 05030 Otricoli (TR) / Italy
/
MACERATOR TOILETS
TOILET MACERATRICI
Multiple STA installation
54
©TECMA SRL

Publicité

Table des Matières
loading

Table des Matières