Installation; Boiler Fixing - Sime MACK 7 Manuel D'entretien

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

3. INSTALLATION

3.1 BOILER FIXING
Assemble the hinge and put on the flange (1) the
screw and two nuts, (see fig. 2).
Widen, if necessary, the insulating gasket holes (5).
Fix the flange (1) to the boiler door (4) using screws (2)
and (if necessary) the nuts (3) interposing the insu-
lating gasket (5), (see fig. 3).
Verify that the installed burner is lightly leaned towards
the button, (see figure 4).
Fig. 3
2
2685
5
1
2
E9066
Fig. 2
4
3
3
GB
S7385
HINGE ASSEMBLY
Fig. 4
D6055
1

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

440 t8099060

Table des Matières