TECNO-GAZ
Once you have placed the equipment following the above mentioned cautions, start filling
the jars up :
• Remove the transparent panel : turn the handgrip at 180°
(if necessary, remove also the cover)
• Open the jars unscrewing the bungs
• Dilute the concentrated solutions as indicated by the manufacturing companies
Fill the jars up:
• WATER with water at about 25 °C
• DEVELOPMENT with proper liquid at about 25 °C
• FIXAGE with proper liquid at about 25 °C
Place again (the cover ) the transparent panel.
Put the hands in the special bushings and start developing .
N.B. respect the time indicated in the table on the cover and copied out in the
development summary.
• Open the radiograph by using the pliers and start the DEVELOPMENT inserting the
film in the special jar.
• Carry out an intermediate washing and then the FIXAGE, always diping in the
homonymous jar.
• Start the final washing and then read the radiograph.
For files under 6 months wash for 3 minutes in water and let dry at room temperature.
For files over 6 months wash for 15 minutes in water and let dry at room temperature.
N.B.
These instructions are generic, proceeding by integrating them with the instructions
given by the radiographs' films and developing liquids' manufacturing companies is
important.
8
INSTRUCTIONS
JARS' REFILLING:
DEVELOPMENT:
FILING:
DRYF020_Rev2.doc