ClO
Measuring Module
2
5
Maintenance
The operation of ClO
-measuring cells requires periodical maintenance and calibration
2
intervals. The amount of electrolyte in the diaphragm cap of the measuring electrode
should be checked from time to time. The maintenance instructions of the probe
manufacturer must be observed.
417101816_Anhang09_ClO2.doc
- 37 -
Rev.: 05-07/10