MPS
Industry 4.0 upgrade kit
®
11 Commissioning
The stations and systems of the MPS
•
partly installed
•
individually adjusted and ready for use
•
pre-commissioned
•
tested
.
All components, tubing connections and cabling are clearly identified so that all of the connections can be
readily restored.
Note:
When stations are combined, the mechanical setup, as well as sensor positions and settings, may
have to be changed.
Step-by-step videos have been created for commissioning, these can be found on the information portal at
http://ip.festo-didactic.com
Alternatively you can scan the following QR code.
11.1 Electrical commissioning
Now the system has to be supplied with electrical power. This is normally done via the SysLink cable, which
is connected to the PLC. Distributor blocks are therefore included, also for the connection of additional
stations. If the cable length from the distributor block needs to be increased, this can only be carried out by
appropriately trained, skilled personnel. The plug socket used must be fused appropriately for the
consuming devices.
In order to avoid problems during operation, individual fusing (16 A) of the system is strongly
recommended.