Warning
Danger due to nonconforming commissioning.
Nonconforming commissioning may lead to injuries and damage
the holder and its surroundings.
• Before commissioning, make sure that the staff in charge have
read and fully understood the contents of the manual.
• In particular, observe the safety recommendations and intended
use.
• The installation must only be commissioned by suitably trained
staff.
Warning
Gases or liquids can leak out indetected through the seals or
the screws.
• Check regularly the holder for leaks.
Warning
before initial operation of the holder, or after a long out-of
use period:
• Ensure that the seal is tight.
• Ensure that all parts are in working order.
10
English
Type 8200
Installation,commissioning
7.2.
installation onto the pipe
Warning
risk of injury if the recommendations on installation of the
measuring device inserted into the holder are not observed
(see the relevant operating instructions).
• Take account of the recommendations on installation of the
inserted probe.
73 mm
0 to ~ 55 mm
→
Weld the steel frame into a circular cut-out of appropriate size
(28 mm diameter).
The holder can be welded at a depth of 0 to 55 mm.
Fig. 3:
Dimensions [mm] for the installation of the holder onto the
pipe
Welding
Wall