▲
▲
AP P LI A N CE D ES CR I PT I ON
8
9
10
11
Part description
1 Outlet nozzles
2 Cover with underlying tank handle
3 Tank handle
4 Water tank
5 Water tank sensor
6 Mist duct; beneath, the nebulisation
chamber is situated
A small felt mat, like this one, is placed on the heating unit, reducing
limestone deposits on the heating unit. Of course, the heating unit
still has to be periodically cleaned (refer to „Cleaning"). The felt mat
can be used multiple times. Regularly rinse it with clear water and
some mild detergent to clean it from limestone (refer to „Cleaning").
60
12
7 Mist pipe
8 Water tank cap
9 Nebulisation unit cover
10 Heating unit
11 Power cable
12 Aroma compartment
1
2
3
4
5
6
7
13
14
15
16
17
18
19