General; Installation Site Selection; How To Install The On/Off Controller - Panasonic CZ-ANC2 Instructions D'installation

Masquer les pouces Voir aussi pour CZ-ANC2:
Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 20
CAUTION
4

1. General

This booklet briefl y outlines where and how to install the ON/OFF controller.
Please read over the entire set of instructions for the indoor and outdoor
units and make sure all accessory parts listed are with the controller before
beginning.
NOTE
Give these instructions to the customer after fi nishing the installation.
Part Name
ON/OFF controller
Tapping screw
Rawl plug
Manual

2. Installation site selection

Install the ON/OFF controller at a height of between 1 and 1.5 meters
above the fl oor.
Do not install the ON/OFF controller in a place where it will be exposed to
direct sunlight or near a window or other place where it will be exposed to
the outside air.
Be sure to install the ON/OFF controller vertically, such as on a wall.

3. How to install the ON/OFF controller

Do not twist the control wiring together with the power wiring or
run it through the same metal conduit, because this may cause a
malfunction.
Install the ON/OFF controller away from sources of electrical
noise.
Install a noise fi lter or take other appropriate action if electrical
noise affects the power supply circuit of the unit.
Do not supply power to the unit or try to operate it until the tubing
and wiring to the outdoor unit is completed.
Figure
Q'ty
1
Truss-head
Phillips
For securing the system
4 × 16 mm
4
controller
For securing the system
4
controller
1
For installation
1
For operation
Remarks

Publicité

Table des Matières
loading

Table des Matières