6.2.3 Feed water hardness - H
Note: Determine the feed water
hardness in °tH. 1 D° = 1,78 F° = 17,8 ppm
•
Adjust the
water hardness
with
arameter.
•
Press
validate the selection and advance
ercentage.
to the next parameter.
6.3. START A MANUAL REGENERATION
There are 2 options to initiate a
y, 2 for Tuesday, 3 for Wednesday, 4 for Thursday, 5 for Friday,
manual regeneration:
7. COMMISSIONING
neously for 5 seconds. Press
We recommend the following steps
for the commissioning of the softener.
;
Wait to put salt in the softener till the
mpurities is recommended (for example salt pellets);
end of the commissioning in line with
) introduces chlorine elements which may reduce the lifetime
the guidelines below.
sins in common use, providing necessary checks on the
•
Put the softener on a smooth and
horizontal surface.
•
The plumbing must be done
according to the rules of the
profession. The diameter of the
drain should be larger than the
If error continue, call technical support.
If error continue, call technical support.
If error continue, call technical support.
place at regular intervals in order to guarantee the proper
ed in the Maintenance record book.
ust be done by qualified personnel only. Failure in respecting this
User Guide Fleck 9100-SXT
and
to
to see the next data. Press
•
Press and release the
The tap icon will start flashing, to
cancel the regeneration request
press
button, the icon will stop
flashing.
The regeneration will start at the
set hour
•
Press and maintain for 5 seconds
the
button, the regeneration will
start immediately
To advance to the nex regeneration
cycle, press the
button.
This will have no effect if the valve is
already advancing to the next cycle.
rinse outlet of the valve.
•
Close the bypass, a water tap and
the inlet valve and let the water flow
for some time to remove the air and
the present particles (due to the
plumbing).
•
Plug the SXT controller to the
power source
•
Proceed to programming according
to chapter 6 'Programming of the
Pallas Condor'.
button.
Manual Pallas Condor
15