Pelgrim ISW950RVS Mode D'emploi page 41

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

INSTALLATION
Montage
• Open the panel.
• Remove the grease filter.
• Interrupt the plug connection of the controls.
• First remove the 6 screws, followed by the frame.
• Use a saw to create a recess in the bottom side of the cupboard
(at a distance of at least 650 mm from a gas hob). Refer to the
measurement drawing for this.
• Attach the unit with the 10 screws provided (12a).
• Put the frame into position with the 6 screws.
• Restore the plug connection of the controls.
• Put the grease filter into position and close the panel.
EN 11

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Isw990rvs

Table des Matières