Function test
Switching on the device
Prerequisite
– The device has been mounted and connected.
– The water supply at the ball valve has been
opened.
– The lateral design covers have been mounted.
– The lower design cover has been mounted.
– The spray shield has been mounted.
– The upper design cover has been mounted.
1
Lift up the design cover.
9007203612975499-1 © 11-2018
968.543.00.0 (00)
2
Switch on the device.
3
Close the design cover.
Result
✓ The LED on the lateral control panel lights up
blue.
✓ The device is ready for operation.
EN
47