INSTALLATION

Before installing the unit, carefully read the safety
instructions at the beginning of this manual.
1. Once the machine has been withdrawn from the
packaging, follow the instructions given in the
"GENERAL DELIVERY NOTES".
2. Position the unit on a horizontal surface.
Arrange the accessories as follows:
3. Insert the ring (b1) inside the seat of the filter
holder.
4. Insert one of the two filters (b0 or b6).
Tank Model
5. Open the hatch (14) and take out the reservoir
(1).
6. Especially the first time, wash the reservoir with
soap and water.
7. Fill the reservoir with water and make certain that
the outside of the reservoir is dry.
8. Return the reservoir (1) to its housing and close
the hatch (14).
Model for Direct connection to the water mains
WARNING
When connecting the mains water supply, always
use a new pipe, suitable for this purpose.
5. Remove the tube from the hatch (14) on the top
part of the machine.
6. Connect the end of the pipe to the fitting on the
base of the machine.
7. Connect the other end of the tube with the 1/8"
union to the mains water supply.
8. Make certain that the water drain tank (7) has
been inserted.
Make certain that the cup support grill (8) is posi-
tioned squarely and is level.
9. Make sure that the steam knob (2) is closed,
facing down.
10. Make certain that the line voltage corresponds to
the requirements indicated on the label.
11. Only insert the plug in the socket if the steam
knob (2) is closed and the mains voltage is the
correct one.
12. The preliminary operations have been completed
and the machine is ready to be set up.
NOTE: At the start of the day's activities and in any
case, if there are any pauses of more than 8
hours, then it is necessary to change 100%
of the water in the circuits, using the relevant
dispensers.
NOTE: In case of use where service is continuous,
make the above changes at least once a
week.
2.1

WATER SPECIFICATIONS

Monitoring of water recipe to keep it within required
levels and maintenance of filtration system is the
user's responsibility.
Failing to meet and maintain water at the following
levels will void the entire warranty:
total hardness 50-60 ppm (parts per million);
water line pressure between 2 – 4bar and water
to be cold;
min flow rate: 200 l/hr;
filtration level below 1.0 micron;
tds (total dissolved solids) level between 50 –
250 ppm;
alkalinity level between 10 – 150 ppm;
chlorine level less than 0.50 mg/l;
Ph level between 6.5 and 8.5.