1. Turn the water supply line valve to the "Open" position.
2. Turn the refrigerator switch to the ON position. See "Power
On/Off Switch" in the Use & Care Guide for instructions. Wait
a few minutes. Check the water line connections for leaks.
3. Remove all boxes, parts packages and packing materials from
the interior of the refrigerator. See the "Cleaning" section in
the Use & Care Guide for instructions. Remove the film and
cardboard from the grille and doors or door frame, depending
on your model.
24
Complete Installation
4. Install the shelves and bins in the refrigerator and freezer
compartments.
5. The controls are preset at the factory to the midpoint setting.
Make sure the compressor is operating properly and that all
the lights are working.
6. If construction will continue after the refrigerator has been
installed, set the controls to OFF.
To get the most efficient use from your new built-in refrigerator,
read the Use & Care Guide. Keep Installation Instructions and Use
& Care Guide near the built-in refrigerator for easy reference.