Promise Technology VTRAK M610p Guide De Démarrage Rapide page 3

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 51
VTrak M610p Task List
Step 1: Unpacking the VTrak (below).
Step 2: Mounting VTrak in a Rack (page 5)
Step 3: Installing Disk Drives (page 6)
Step 4: Making Management and Data Connections (page 9)
Step 5: Making Serial Cable Connections (page 11)
Step 6: Connecting the Power (page 12)
Step 7: Setting the IP Address (page 13)
Step 8: Creating Disk Arrays with WebPAM PROe (page 17)
Step 1: Unpacking the VTrak
The VTrak box contains the following items:
VTrak Unit
Quick Start Guide
Front bezel and key
Null Modem Cable
Left and right center-mount
brackets
Left and right mounting rails
The electronic components within the VTrak disk array are
sensitive to damage from Electro-Static Discharge (ESD).
Observe appropriate precautions at all times when handling the
VTrak or its subassemblies.
Use the following categories of network cables with VTrak:
Cat 6, preferred
Cat 5E, minimum
1.0m External VHDCI SCSI cable
(2)
Screws for disk drives
(66, including 2 spares)
1.5m (4.9 ft) Power cords (2 for US
and 2 for Europe)
CD with SNMP files, Product
Manual and Quick Start Guide
Warning
Important
3
Step 1: Unpacking the VTrak

Publicité

Table des Matières
loading

Table des Matières