3. Remove all the unassembled
parts from the box.
4. Remove the snow thrower from the box.
5. Dispose of the box and packaging in
compliance with local regulations.
4.2 ASSEMBLY OF MOVEMENT AND
AUGER CONTROL CABLES
ST 526 S
Couple the cable eyelet to the
specific opening (fig. 5.A, fig 5.B).
NOTE The cables are already
pre-assembled on the dashboard.
ST 627 S
1. Remove the cotter pin (fig.
5.C) from the peg (fig. 5.D).
2. Insert the eyelet (fig. 5.E) of
the movement control cable
onto the peg (fig. 5.D).
3. Hook the cotter pin to lock
the cable (fig. 5.G).
4. Hook the slot of the
auger control cable in the
appropriate eyelet (fig. 5.B).

4.3 HANDLE ASSEMBLY

The handle is delivered with the dashboard
already assembled. The screws for installing the
handle on the machine, the screws for securing
the gear control and the fasteners for attaching
the discharge chute and the gear lever and
deflector lever grips are all delivered in a separate
package inside the box with the machine.
Install as follows:
1. Bring the two tubes at the ends of the handle
(fig. 6.A) up to the support (fig. 6.B).
2. Insert the spacers (fig. 6.C) and align
the holes, taking into account the
correct diameter (smaller cavity pointing
out, bigger cavity pointing in).
3. Insert the screws in the holes and
secure in place with the nuts.
4.3.1 Installation of the lever grips
Screw the grips onto the threaded rod of
the gear lever (fig. 7.A) and the threaded
rod of the deflector adjustment lever
(fig. 7.B, Type ST 526 S) accordingly.
Tighten the fixing nut.
4.4 INSTALLATION OF THE
GEAR CONTROL
1. Insert the articulated joint (fig. 8.A) of
the gear control in the hole on the lever
(fig. 8.B) to connect it to the transmission
and secure in place with the nut (fig. 8.C).
2. Bring the top part (fig. 8.D) of the gear
control up to the hole on the bottom part
of the gear lever and secure in place by
inserting the peg (fig. 8.E) and the cotter
pin (already on the gear lever) (fig. 8.F).

4.5 DISCHARGE CHUTE ASSEMBLY

1. Only for Type ST 627 S: disassemble the lid
of the discharge chute rotation motor, by
unfastening the two front screws (fig. 9.G).
2. Position the sliding ring (fig. 9.D) and
the discharge chute (fig. 9.C) on the
flange fitting (fig. 9.E).
3. Insert the skids (fig. 9.B) under the
flange fitting (fig. 9.E) by matching
up the holes on the skid with the
holes at the bottom of the chute.
4. Insert the screws with the washers
(fig. 9.A)in the holes and fasten.
5. Only for Type ST 627 S: re-assemble the
lid of the discharge chute rotation motor, by
fastening the two front screws (fig. 9.G).
4.5.1 Installation of the discharge chute
adjustment cable (ST 526 S)
The adjustment cable is designed to connect
the discharge chute to the adjustment handle
on the dashboard so that the operator can point
the discharge chute in the required direction.
1. Secure the worm screw unit (fig. 9.F) onto the
support, checking the correct engagement
of the worm screw unit with the toothed
section on the discharge chute (fig. 9.C).
2. Engage the square section of the flexible
cable in its seat at the bottom part of the
handle(if not previously assembled).
3. Tighten the cable ring nut (fig. 10.B) on
the bottom part of the handle (fig. 10.A) (if
not previously assembled).
4.5.2 Assembly of the deflector
adjustment cable (ST 526 S)
The deflector adjustment cable is designed
to connect the discharge chute deflector
to the control on the dashboard so that the
operator can lift/lower the deflector so that
it is pointing in the required direction.
EN - 8

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

St 4262 pSt 4262 pbSt 5262 pSt 5266 pSt 627 sSt 6276 pb

Table des Matières