Installation; Before The Installation; Panels Opening - Elica SUT950 Guide D'utilisation, D'entretien Et D'installation

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

BEFORE THE INSTALLATION

This models can be used only if connec­ted with
external
motors
manufacturer.

PANELS OPENING

It is possible to open the steel panels, which
cover the grease filters, by slightly pulling on
a side of the panel itself, as shown in Fig. 1.
To achieve the complete opening of panels, you
need to release the safety chains, by using the
appropriate spring catches.
For proper working, it is recommended to install
the appliance at a distance of 2000
< 2100 mm from the floor.
Before starting the appliance installation,
please
check
that
damaged, in such a case contact your retailer
and do not carry out installation.

INSTALLATION

Fit a false ceiling with an opening that has the
following dimensions:
SUT950: 1465x965 mm with a minimum
distance of 330 mm between the ceiling and the
false ceiling;
SUT951: 1065x665 mm with a minimum
8
INSTALLATION
produced
by
the
all
components
are
distance of 330 mm between the ceiling and the
false ceiling.
same
After having chosen the most suitable po­sition,
prepare the ducting: an air outlet connection
piece, with a diameter of 150 mm to be installed
in
the
side
appliance.
Leave
any
unused
shown in fig.2.
Draw
the
outline
ceiling<mounted hood
shown in Fig. 3 according to the model chosen.
not
Make 4 holes in the ceiling according to the
dimensions as shown in Fig. 4, place the metric
plugs provided in the holes.
selected,
is
provided
exhaust
outlets
of
the
hole
to
on
the solid ceiling as
with
the
closed.
As
house
the

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Sut951

Table des Matières