Electrical Installation - Vetus BOW5512A Manuel D'utilisation Et Instructions D'installation

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 33

Electrical installation

Make sure that no other electrical parts come loose
when connecting the electric cables.
Check all electrical connections after 14 days. Electrical
parts (such as bolts and nuts) may come loose as a
result of fluctuations in temperature.
Check that the voltage, recorded on the motor type plate, is in
agreement with the vessel's circuit voltage. Position the battery
or batteries as close as possible to the bow thruster; the main
power supply cables can then be short, which reduces the volt-
age drop as much as possible.
Connect the main power supply cables.
N.B.!
Be careful not to rotate
the bolt and nut 1 while
connecting the cables.
To prevent this hap-
pening, keep an open-
ended spanner on nut
1 while screwing on bolt
2, without rotating this
spanner.
The torque for nut 2 is a
maximum of 11 Nm.
Fit the control panel next to the steering position. There must be
at least 50 mm space behind the panel.
Operation manual and installation instructions Bow thruster 55 kgf, ø 150 mm
Fit
the
control
cable between the
bow thruster and
the control panel
through the ves-
sel and connect
the jack connec-
tions together.
If it is necessary
to cut the inter-
mediate cable and reconnect it take care to ensure the correct
colours are connected together.
N.B: The colours of the wire cores in the intermediate cable may
differ from the wire core colours as used on the bow thruster
motor and on the control panel!
A time-delay (BPTD) can be
fitted between the bow thrust-
er motor and the operating
panel switch. This allows
the electric motor to come
to a stop when a switch is
made from port to starboard
(or vice-versa) in one move-
ment.
If there are two steering positions, the second control panel can
be connected to the first one.
If it is found during test run-
17
ning that the thrust direction
does not correspond with the
direction switch on the con-
trol panel then the blue (no.
1) and the white (no. 4) wires
on the relay must be inter-
changed.
17
Do NOT test the bow thruster while the ship is out of
water, unless you are certain that everyone is at a safe
distance from the thrust tube.
Never allow the bow thruster to run for longer than 5
seconds with the ship out of water.
ENGLISH
ENGLISH
WARNING
020522.08
17

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Bow5524aZe250Ze125Bow7512Bow7524

Table des Matières