geo-FENNEL FL 70 Premium-Liner SP Mode D'emploi page 25

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

OPERATING ELEMENTS
1. Vial
2. Receiving window
3. Sound on / off
4. On / Off switch
5. Vial
6. Display
7 . Zero indication line
8. Loudspeaker
9. LED / arrow
10. LED / point
11. LED / arrow
12. Zero indication line
13. 1/4"mounting hole (for the clamp)
Battery compartment
INSTALLATION OF THE BATTERIES
·
Open the battery compartment cover (14).
·
Insert 1 x 9 V AA battery according to the installation symbol (ensure correct polarity!). Close the
cover.
In order to save battery power the receiver will automatically power off if it has not received a laser
signal for 10 minutes.
EN
25

Publicité

Table des Matières
loading

Table des Matières