Alternate Blower Configuration
NOTE: After establishing the location of the products to be
installed, the blower can be configured to support the desired
ducting location.
Left Discharge
Rear Discharge
Internal (Non-Ducted) Venting and Right Discharge
Complete Installation
1. Connect cable assembly and ground wire from vent intake to
blower motor. See following sequence figures.
A)
A. Cable assembly from vent intake
B. Remove 3 screw and put aside you
will use later
C. Tape to be removed later
D. Blower / Motor
E. Electrical box
B)
A. Assemble cable
A
B
C
D
E
A
15