Complete Installation - Jennair JVD0303GS Instructions D'installation

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Alternate Blower Configuration
NOTE: After establishing the location of the products to be
installed, the blower can be configured to support the desired
ducting location.
Left Discharge
Rear Discharge
Internal (Non-Ducted) Venting and Right Discharge

Complete Installation

1. Connect cable assembly and ground wire from vent intake to
blower motor. See following sequence figures.
A)
A. Cable assembly from vent intake
B. Remove 3 screw and put aside you
will use later
C. Tape to be removed later
D. Blower / Motor
E. Electrical box
B)
A. Assemble cable
A
B
C
D
E
A
15

Publicité

Table des Matières
loading

Table des Matières