Installation Requirements; Tools And Parts; Location Requirements - Jennair JVD0303GS Instructions D'installation

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Tools and Parts

Gather the required tools and parts before starting installation.
Read and follow the instructions provided with any tools
listed here.
Tools Needed
Tape measure
Phillips screwdriver
Flat-blade screwdriver
Level
Drill
Parts Supplied
Check that all parts are included.
Blower housing assembly with electrical box and intake
assembly
Grease filter
2 - Type-A brackets
4 - Type-B brackets
7 - Thread cutting screws
Round duct 2-piece telescoping ducts
1 - Blower assembly duct mounting ring
Foam strip
1 - Intake Transition
Parts Needed
For vented installations:
6" (15.2 cm) round metal ducting.
Jenn-Air
wall cap:
®
Jenn-Air
6" (15.2 cm) round wall cap with damper
®
(8) Round or pan head wood and (8) sheet metal screws
See the "Assistance or Service" section in your Use and Care
manual to order.
For non-vented installations:
Recirculation Kit part number W10807915 (See the
"Assistance or Service" section in your Use and Care
manual to order).
a. Recirculation duct housing
b. (4) Mounting screws
c. (2) Charcoal filters
d. Recirculation housing cover
e. (2) Mounting screws – cover
f.
Duct extension
g. (4) Mounting screws – duct extension
For non-vented installations (recirculation only):
1-6" (15.2 cm) round 90 degree elbow and 1-6" (15.2 cm)
round to 3Z\v" x 10" (8.3 cm x 25.4 cm) transition and
1- 3Z\v" x 10" (8.3 cm x 25.4 cm) elbow.
Plywood Pedestal to raise blower mounting. See "Product
Dimensions" section for detail non-vented installation.
For side cabinet discharge a 31/4" x 10" (8.3 cm x 25.4 cm)
straight duct will also be required.
Check local codes. Check existing electrical supply. See the
"Electrical Requirements" section.
It is recommended that all electrical connections be made by
a licensed, qualified electrical installer.

INSTALLATION REQUIREMENTS

Marker or pencil
Pliers
Jigsaw
Caulking
Aluminum metal duct tape

Location Requirements

IMPORTANT: Observe all governing codes and ordinances.
When installing the downdraft vent, use the minimum
dimensions given.
Use the countertop opening dimensions that are given
with these Installation Instructions. Given dimensions are
minimum clearances and provide 0" (0 cm) clearance.
The model/serial/rating label is located on the front face of
the electrical junction box cover.
A. Model/serial/rating label location
Grounded electrical supply is required. See the "Electrical
Requirements" section.
If cabinet has drawers, drawers will need to be removed
and drawer fronts installed on front of cabinet.
NOTE: The exhaust system is for outside venting. For
non-vented (recirculating) installation, see "Recirculation: Non-
vented (Recirculating) Installations Only" in the "External Venting
Dimensional Planning" section. Recirculating Kit part number
W10807915 is available from your dealer or an authorized parts
distributor.
IMPORTANT: An under-counter built-in oven cannot be installed
under this product.
A
3

Publicité

Table des Matières
loading

Table des Matières