GB
Electrical connection - Standard circuit
E.g. Lamp control
Strip connecting cables to approx. 6–8 mm and connect
as follows:
• Refer to the connection diagram
• Phase L to terminal L
• Neutral wire N to terminal N
• Do not remove wire bridge between L and D1
• Switch wire to the consumer to terminal D2
The motion switch is ready for operation approximately
90 seconds (calibration time/warm-up time) after connec-
tion to the power supply system.
Ground connection (gnge) to terminal „
L
N
"
Wire Bridge
N
L
D1
Motion Switch
Load/
Consumer
D2
77