Installation Procedure - Toto TBMV2 Manuel D'installation Et D'utilisation

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

ssembly (2)

INSTALLATION PROCEDURE

Gasket
1.
Thread mounting nut to the bottom of
(Rubber)
the mounting pipe body. Place washer
and gasket as shown.
Washer
(Metal)
Mounting
Nut
2.
Pass the mounting pipe body up through
the installation hole.
Insert the O-ring and fasten the collar to
the pipe body until it stops.
3.
Fixate the mounting pipe by threading
the mounting nut up the pipe until hand
tight. Tighten the retaining screws
equally to secure.
Do not overtighten!
4.
Fasten the leader hose to the bottom
opening of the diverter.
Pass the hose up through the handshower
mount. Leave end of hose above deck for
future handshower installation.
Secure hose above deck.
A loop of tape will work.
5.
Leave diverter plug in place while conducting
leak testing.
Construction of access panel in tub surround for
future service is recommended.
Diverter Assembly*
Mounting
Handshower Outlet
- Handshower Mount (TBMV2
Gasket
(Rubber)
Washer
(Metal)
Nut
6
(TBMT Only)
ONLY)
Gasket
Gasket
(Rubber)
(Rubber)
Washer
Washer
(Metal)
(Metal)
Mounting
Mounting
Nut
Nut
Collar
O-ring
Mounting
Mounting
Nut
Nut

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Tbmt2

Table des Matières