INSTALLATION PROCEDURE - VALVE
2.
Pass the valve up through the installation
hole.
Insert the O-ring and fasten the collar to
the valve body until it stops.
NOTE: The hot water valve has a red
marking on side of body.
3.
Fixate the valve by threading the
mounting nut up the valve until slightly
loose (need adjustability for copper
pipe installation later).
Do not overtighten!
4.
Repeat steps 1-3 for other valve.
5.
Cut copper tube to size to fit distance be-
tween valve and diverter.
Place the ferrule inside compression nut and
place on each end of copper tube as shown.
Insert ends of copper tube into ports as
shown and fasten nuts to secure.
Repeat with remaining side.
Finish tightening
mount nuts on valves.
Tighten retaining nuts equally
to secure.
Installation of TBMT2 is now
complete. If installing TBMV2,
please continue.
Mounting
Nut
Copper
Copper Tube
Ferrule
Ferrule
Tube
5
Collar
O-ring
Compression
Compression
Nut
Nut