Installation And Set-Up - brennenstuhl BG 2202 Mode D'emploi

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 20
Operating Instructions

4.3 Installation and set-up

• Before beginning installation, shut off the
electricity in order to prevent electric shock or
damage to the device.
• After selecting the mounting site, make sure
that there are no electrical lines or pipes in the
mounting area.
• Mount the mounting ring in the right place.
• Drill holes in the marked locations.
• Insert anchor bolts in the drilled holes.
• Screw on the mounting ring. DO NOT
OVERTIGHTEN THE SCREWS.
• Screw the detector onto the mounting ring, paying
attention to the openings for the adapter plug.
• Connect the power cord for the12 V DC power
supply/transformer. In the case of direct
connection to a 12 V DC battery, a switch can be
installed between the battery and the device.
• Connect the transformer to a 230 V electrical
outlet. The gas detector will be operationally
ready in 2 minutes. The green light will burn
continuously.
• If you are not sure about the type of gas used,
or if problems occur during the installation of
your gas detector, consult a trained technician.
16
BG 2202

Publicité

Table des Matières
loading

Table des Matières