5.5 After installation
90
1. Establish the voltage supply.
2. Check function.
The installation was performed correctly, if the following
is true:
Controller (for LEDs see Fig. 30):
• LEDs for power supply light up
(LED 15, 16, 17).
• All LEDs for the open input contacts light up
(LED 10, 11, 12, 13).
• The LEDs for the closed input contacts do not light up
(LED 10, 11, 12, 13).
• The LEDs for the RS-485 interfaces do not flash
(LED 1, 2, 4).
• The network connection LED lights up
(yellow LED at network connection "A").
Configuration and start-up
The system configuration and the configuration of the Micro SD
cards take place via the software and are carried out by the
system supplier's customer service. The initial start-up of the
access control system is also carried out by the system supplier's
customer service.
More information about the start-up and configuration of the
SD card and the overall system can be found in the Dialock 2.0
user manual.
LEDs on the WTC 200
Fig. 30: Overview of LEDs on the WTC 200 controller
1-17
LED 1–17
A
Network connection