Assembly; Tubes Assembly - Efco SA 3000 Manuel D'utilisation Et D'entretien

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

en
10

ASSEMBLY

The machine is supplied ready for use in the blower version.
11
The kit, supplied separately as an optional accessory, allows the
machine to be used as a vacuum / shredder (see page 23-24-25).

Tubes assembly

WARNING – When fitting the tube and nozzle, the
engine must be off and the switch in the STOP
position.
For ease of assembly, the two pins (A, Fig.11-12) on the housing
and on the tubes are two different sizes. This means that the
12
tubes cannot be assembled incorrectly.
1. Fit the blower tube (B, Fig.13), so that the two pins (A) on the
spigot of the impeller housing engage the two slots (C) in the
blower tube. Rotate the blower tube in the direction of the
arrow (2). When fitted, tube should appear as shown in Fig.
14. Secure the tube with the screw (G, Fig.14).
2. Fit the nozzle (D, Fig.15) on to the tube (B), so that the two
pins (E) on the blower tube engage the two slots (F) in the
nozzle. Rotate the nozzle in the direction of the arrow (2).
When fitted nozzle should appear as shown in Fig. 16.
3. OPTIONAL – To obtain a more directional and effective
jet of air when blowing, the duckbill style outlet can be
fitted to the tube (Fig.17) in place of the nozzle. The kit, p/n
13
56552002, can be purchased separately. To assemble, follow
the instructions of point 2. When fitted, the duckbill tube will
appear as in Fig.18.
14
15

Publicité

Table des Matières
loading

Table des Matières