Amana AMAP081BW Guide D'utilisation page 8

Masquer les pouces Voir aussi pour AMAP081BW:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Install Side Curtains
NOTE: Attach curtains to the air conditioner before placing
the air conditioner in window.
1.
Install side curtain
Right curtain frame
Tabbed side of curtain
Holding the center of the right-hand side panel in one hand, pull
the curtain open. Place the tabbed side of the side curtain in the
track on the right-hand side of the air conditioner cabinet.
Slide the side curtain down the track, making sure to leave
enough space to slip the top and bottom of the frame into the
channels on the cabinet.
2.
Insert curtain frame into channels
Slide the side curtain frame into the top channel and bottom
channels of the air conditioner. Make slight adjustments until
the panel sits securely inside the channels.
Repeat steps 1 and 2 for other side curtain and frame.
8
Install Air Conditioner in Window
WARNING
Excessive Weight Hazard
Use two or more people to move and install
air conditioner.
Failure to do so can result in back or other injury.
IMPORTANT:
Be sure your air conditioner does not fall out of the opening
during installation or removal.
The place where the power cord exits the air conditioner
should be no more than 6 ft (183 cm) from a grounded outlet
To maximize cooling efficiency and air circulation, do not
block the air intake or discharge louvers in the front panel.
To reduce cycling on and off of the compressor and reduce
the risk of freezing up or damage to the unit, do not block the
louvers on the outside of the air conditioner.
1.
Position air conditioner in window
A
C
A. Air conditioner
B. Bottom channel
Using two or more people, place the air conditioner into the
window opening so the bottom of the air conditioner frame is
against the window sill. Tilt the back of the unit slightly downward
to allow accumulated rain water to drain out.
2.
Lower window sash into place
A. Side curtain
against window
channel
B. Window sash
behind top
channel
A
C. Bottom channel
behind window
sill
Lower the window sash behind the top channel to hold the air
conditioner in place.
NOTE: Your model may differ from the one shown.
B
D
C Windowsill
D. Outside
B
C

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Amap101bwAmap121bwAmap151bwAmap182bwAmap222bwAmap242bw

Table des Matières