Panasonic U-8ME1E8 Mode D'emploi page 217

Masquer les pouces Voir aussi pour U-8ME1E8:
Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 33
Reference diagram for air-discharge chamber (fi eld supply)
Can be installed so that the air direction is to the front, right, left or rear direction.
According to the installation site, you may choose the setting position in the depth direction of the anchor bolt from "A", "B" or "C".
Diagram for 54hp
*b
11
978
*a
1518
*a
1518
933
1473
1473
Diagram for 56hp ~ 60hp
*b
11
1518
*a
1518
*a
1473
1473
unit: mm
Air direction: Front direction
For 54hp
*a
A : 894 (Installation hole pitch)
60
* The tubing is routed out from the front.
B : 730 (Installation hole pitch)
180
* The tubing is routed out from the bottom.
C :730 (Installation hole pitch)
180
930
35
34
11
18
unit: mm
Air direction: Front direction
For 56hp ~ 60hp
*a
A : 894 (Installation hole pitch)
60
* The tubing is routed out from the front.
B : 730 (Installation hole pitch)
180
* The tubing is routed out from the bottom.
C :730 (Installation hole pitch)
180
930
35
34
1518
11
18
1473
S–9
SUPPLEMENT
3. Dimensions of Snow Ducting
Reference diagram for snow-proof vents (fi eld supply)
Can be installed so that the air direction is to the front, right, left or rear direction.
According to the installation site, you may choose the setting position in the depth direction of the anchor bolt from "A", "B" or "C".
Model : U-8ME1E8, 10ME1E8, 12ME1E8
*b
624
4200
4440
4440
748
703
535
535
1840
Model : U-14ME1E8, 16ME1E8
*b
853
4740
4980
4980
978
933
535
535
2070
Air direction: Front direction
624
930
35
34
535
1465
Air direction: Front direction
853
930
35
34
535
1465
S–10
unit: mm
Air direction: Rear direction
930
34
35
535
unit: mm
Air direction: Rear direction
930
34
35
535

Publicité

Table des Matières
loading

Table des Matières