Commissioning; Connection Details - WIKA 702.02.100 Mode D'emploi

Masquer les pouces Voir aussi pour 702.02.100:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

7. Commissioning

7. Commissioning
7.1 Mounting of the pressure connection
GB
Pressure entries identified j and i
During the commissioning process, pressure peaks must be avoided absolutely.
Open the shut-off valves slowly.
7.2 Wiring details
(applies to Model 702.02/03.100 and 851.02.100)
T
The electrical connections should be made by qualified electricians
T
Connection details and switch functions are given on the instrument rating
plate. Connection terminals (1 ... 6) and the ground terminal are appropriately
marked.
T
The mains connection lines to be provided must be suitable for maximum
instrument power consumption and comply with IEC 227 or IEC 245
T
The instruments must be included in the equipotential bonding of the plant

Connection details

Connection is via a
terminal box or L-plug
per DIN 43 651
850.33 2nd contact
850.3
1st contact
Setting the switch point
The switch points are set by means of the setpoint screws, accessible from the
front. The 270 p° assistant scale indicates the current setpoint.
For contact re-adjustment, lever the window out of the case via the recess in its
circumference. The desired switch point can be set by turning the setpoint
screw.
Afterwards press the window back into the case.
8
WIKA Operating instructions DELTA-plus, DELTA-comb and DELTA-switch per ATEX
Terminal box
j high pressure
i low pressure
Connection is via a
cable gland and cable
850.3
1nd contact
850.33
2st contact

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

702.03.100702.01.100851.02.100

Table des Matières