Mitsubishi Electric CITY MULTI PQHY-P200YHM-A Manuel D'installation page 13

Table des Matières

Publicité

11
[Fig. 11.3.5]
<A> Change the jumper connec-
tor from CN41 to CN40 *1
<B> SW2-1:ON *2
<C> Keep the jumper connector
on CN41
<B> SW2-1:ON *2
A : Group 1
B : Group 3
C : Group 5
D : Shielded wire
E : Sub remote
controller
( ) Address
[Fig. 11.3.6]
L
11
OS
OC
(52)
(51)
M1M2 S
M1M2 S
TB7
TB7
CN41
CN41
TB3
TB3
M1 M2
M1 M2
• ( ) Address
• Daisy-chain terminals (TB3) on heat source units in the same refriger-
ant system together.
• Leave the power jumper connector on CN41 as it is. When connecting a
system controller to the transmission line (TB7) for centralized control,
refer to [Fig. 11.3.1], [Fig. 11.3.2], or DATA BOOK.
[Fig. 11.4.1]
A : Switch (Breakers for wir-
ing
and
current
leakage)
B : Breakers for current
leakage
C : Heat source unit
D : Pull box
E : Indoor unit
F : BC controller
(standard or main)
(for PQRY-P·Y(S)HM-A)
F' : BC controller (sub)
(for PQRY-P·Y(S)HM-A)
OC
CN41 CN40
BC
(51)
(52)
TB02
TB3
M1 M2 S
M1 M2
M1M2 S
TB7
D
OC
CN41
BC
(53)
(54)
TB02
TB3
M1 M2 S
M1 M2
M1M2 S
TB7
System
controller
A B
S
L
L
12
13
BC
IC
TB02
TB5
M1M2 S
M1M2 S
B
3N~ (L
, L
, L
, N)
1
2
3
380-415V
B
~ (L, N)
220-240V
11.3
L
1
A
B
IC
IC
(01)
(04)
TB5
TB15
TB5
TB15
M1 M2
S
1 2
M1 M2 S
1 2
A B
MA
L
3
IC
IC
(03)
(02)
TB15
TB5
TB 15
TB5
1 2
M1 M2 S
1 2
M1 M2 S
A B
MA
L
14
Ground
IC
RP
TB2
TB3
A B
S
A B S
TB5
M1M2 S
A B
RC
11.4
A
C
PE
F
A
E
E
PE
PE
C
IC
BS
(55)
(05)
c
2
TB02
TB5
TB15
M1 M2 S
M1 M2 S
1 2
c
A B
A B
MA
MA
E
L
4
IC
(07)
TB15
TB5
1 2
M1 M2 S
L
L
16
17
IC
IC
TB5
TB5
M1M2 S
M1M2 S
A B
RC
F '
D
E
E
PE
PE
IC
(06)
TB5
TB15
M1 M2 S
1 2
4
13

Publicité

Table des Matières
loading

Table des Matières