• Several solid fuel stoves can be connected to the same chimney
system if the chimney cross section is adequate.
• Connection to the chimney must be performed in accordance
with the installation instructions of the chimney supplier.
• Before a hole is made in the chimney, the stove should be
moved into its provisional position to enable correct marking
out of the position of the stove and hole in the chimney. See
fig. 1 for minimum dimensions.
• Make sure that the flue pipe rises all the way up to the chimney.
• Use a flue pipe bend with a sweep hatch to allow sweeping.
Please note that it is extremely important for connections to
have a degree of flexibility. This is to prevent any movement in
the installation leading to the formation of cracks.
NB! A correct and airtight connection is extremely important for
the function of the product.
Weight must not be transferred from the fireplace structure to the
chimney. The fireplace structure must not hinder the chimney's
ability to move, and must not be anchored to the chimney.
For recommended chimney draught, see "2.0 Technical data".
If the draught is too strong, action must be taken, e.g. install
and operate a flue pipe damper in order to reduce the draught.

3.6 Before installation

Check that the fireplace insert is undamaged before installation
begins.
1. The standard product comes in a single package.
2. Once the product has been unpacked, take the box containing
the smoke bell, log retainer,, gasket and bag of screws out of
the burn chamber. Then remove the air duct (fig. 4 D), baffle
(fig. 5 B), exhaust deflector (fig. 5 A), side burn plates and rear burn
plate (fig. 4 E).
Installation
The product is heavy! Make sure the product does not topple over.
Ensure you have help when positioning and installing it.
1. Remove the heat shields by unscrewing the two screws,
M8x20 mm, on either side (fig. 3 A) of the burn chamber.
2. Lay the product carefully down on its back. You can put the
cardboard packaging on the floor to protect it from scratches, etc.
3. Remove the screws, M8x20 mm, holding the two side legs to
the burn chamber. (fig. 6 A).
4. Adjust the length of the side legs by fixing the bolt in the
upper leg aperture as shown in the illustration (fig. 7 A).
5. Lay the product carefully over on its side and adjust the rear
leg in the same way as for the side legs (fig. 8).
6. Screw the foot screws (fig. 9 A) into the legs.
7. Mount the heat shield (fig. 10 A) to the underside of the
burn chamber using the accompanying screws and sleeves
(fig. 10 B).
8. Stand the product up carefully. Important! Adjust the foot
screws slightly to level the product.
9. Replace the exhaust deflector (fig. 5 A), baffle (fig. 5 B), side
burn plates and rear burn plate (fig. 4 E), air duct (fig. 4 D)
and log retainer (fig. 4 C).
10. Replace the heat shield on the burn chamber using the same
screws (fig. 18 A) they were fastened with before.
11. Unscrew the upper heat shield at the rear (fig. 18 B). Turn it
upside down and screw it firmly in position using the same
screws it was fastened with before.
24
Installation of the smoke bell and flue pipe
(fig. 12)
The smoke bell can be installed from outside or inside as required;
Option 1 – installed from outside (fig. 12 A):
1. Install the accompanying gasket on the underside of the edge
of the smoke bell in the gasket channel (fig. 12 A-2).
2. Install the smoke bell from outside by fixing it in place using
the four accompanying M8x20 mm screws (fig. 12 A-1).
3. Then rotate the smoke bell to the desired position (fig. 17).
Tighten the screws.
4. Then install the flue pipe in the product's smoke bell. Use
gasket rope between the smoke bell and the flue pipe.
Option 2 – installed from inside (fig. 12 B):
1. First screw in halfway and diagonally 2 screws with washers
(fig. 13 A). Install the accompanying gasket on the top side
of the edge of the smoke bell in the gasket channel (fig. 12
B-1).
2. Move the smoke bell up inside the burn chamber so the smoke
bell notch is against the screws with washers (fig. 14 A).
3. Turn the smoke bell slightly so that it is resting on the screws
with washers (fig. 15 A).
4. Then screw in the two other screws (fig. 16 A) and then screw
all the screws almost all the way in.
5. Rotate the smoke bell to the desired position (fig. 17). Tighten
the screws.
6. Then install the flue pipe in the product's smoke bell. Use
gasket rope between the smoke bell and the flue pipe.
3.7 Checking the functions (fig. 4)
Once the product has been assembled, always check the control
handles. These must move easily, and work in a satisfactory
manner.
Jøtul I 400 is equipped with the following operating options:
Air vent fig. 4 A
Left position
closed
Right position
fully open
Lighting vent fig. 4 BLeft position
Right position
Fully open

3.8 Ash removal

1. Only remove ash when the stove is cold.
2. Always leave some ash there as a protective layer over the
bottom of the fireplace.
See also the description of how to handle ash in the General User
and Maintenance Instructions under point "6.1 Fire Prevention
Measures".
4.0 Servicing
Warning!
Any unauthorised changes to the product are illegal!
Only original spare parts may be used!
4.1 Replacing the baffle/exhaust deflector
(fig. 5)
NB! The burn plates are made of a porous material (yellow
vermiculite) and may be damaged if they are handled roughly.
1. Lift the baffle up on its side and ease it out (fig. 5 B).
2. Lift the exhaust deflector (fig. 5 A) up slightly, pull it right
Closed