8. Fill the coffee jug
up to the mark for the required number of cups.
4
5
6
9. Open the water tank
12 13 14
10. Pour the water into the water tank
indicator
.
8
9 10
11. Close the water tank
12 13 14
12. Place the coffee jug
4
5
13. Plug the power plug
7
8
 The appliance switches on automatically. The time and the current
settings are shown on the display.
14. Press the "GRIND OFF" button to switch off the grinder.
 The LED next to the "GRIND OFF" button comes on.
GB
15. Press the "
" button.
 The LED next to the "
brew the coffee and the "
16. Wait until the appliance beeps 3 times and the "
 The coffee is ready.
TIP
The coffee will be kept hot for 35 minutes if you
do not press the "
28
.
. Check the water level at the level
12 13 14
.
on the hotplate
.
6
6
7
8
into the socket.
9
" button lights up. The appliance begins to
" symbol appears on the display.
" symbol goes out.
" button after brewing.
6 Brew programming
CAUTION!
Before brewing make sure that the appliance is put
together correctly, otherwise the appliance may be
damaged.
When you program the brewing function, the coffee maker will brew coffee to
the programmed settings at the set time.
1. Program the required settings for the brew, ►"5.1 With coffee beans"
on page 26 or ►"5.2 With ground coffee" on page 27.
2. Press and hold the "PROG" button for 2 seconds.
 The time is shown flashing.
3. Repeatedly press the "h" button to set the hour.
4. Repeatedly press the "min" button to set the minutes.
5. Press the "PROG" button to confirm your entry.
 The current time and "
" are shown on the display. The LED next
to the "PROG" button comes on. The coffee maker will brew coffee
to the programmed settings at the set time.
Press the "PROG" button again to switch off programmed brewing function.
 The LED next to the "PROG" button goes out. Programmed brewing
is switched off.