Pentair MYERS HJ Série Notice D'utilisation page 6

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Installation
Fuse box or Circuit breaker
Pressure Gauge
(Purchase Separately)
Copper electric wire with ground
Discharge Tee
Shallow Well
Convertible
Figure 1 - Typical Shallow Well Pump Installation
Well Point Installation
If installing a well point instead of a foot valve, follow
the instructions included with the well point. In addition:
a. Do not install a well seal
b. Install the two check valves: one on the well side of
the pump; one on the house side.
Step 7
1-1/4" PVC Adapter
Step 5
Venturi
Nozzle
Shallow Well Ejector
Step 4A
Step 4
1-1/4" rigid PVC Pipe
1-1/4" PVC Elbow
Well Seal
1-1/4" rigid PVC Pipe
1-1/4" PVC Adapter
Step 6
1-1/4" PVC Adapter
1-1/4" Foot Valve
6
Check Valve
1-1/4" Elbow
Step 3
1-1/4" Galv.
Pipe
Well Point
Step 2
Step 1
6513 0312

Publicité

Table des Matières
loading

Table des Matières