300 mm
L
of a 12 mm
I
2
2,5 mm
ness of less than 1,2 mm.
railings or bars is over 2,5 m above the ground.
- check the gate components, replace any worn or damaged parts
and then lubricate them.
N
O
and must not inhibit the gate's sliding action.
- check that a mechanical travel limit Q (absolutely necessary) has
been fitted in the opening direction and that it corresponds to the
P
The travel limit must guarantee anti-derailment and gate stability.
Warning! It is the installer's responsibility to check all criti-
cal danger points, to take action and to install any devices
needed to guarantee the safety of all people using the gate
(risk analysis).

INSTALLATION INSTRUCTIONS

of the passageway. Important
FOR POSITIONING THE UNIT
Anchoring the unit (fig. 4, 5, 6)
Important! Check the exact anchoring position with respect to the
alignment of the sliding gate.
is to be installed (see fig. 2).
trude by 40 mm and then tighten down using the supplied M8 nuts.
installed, with a depth of 350 mm (the base should protrude by about
25 mm to avoid damage by pools of water building up under the
appliance).
C
base plate is perfectly level;
- the four protruding threaded bolts are perpendicular to the base
plate;
- the surface area of the base plate is clean and free of cement residue.
4
B
C
1
2
5
I
M
L
P
INSTRUCTIONS
A
B
M 8
A
3
4
300
If the runner guide already exists the cement base should be extended
to take in part of the runner guide foundation. This will stop the two
foundations from giving way separately.
- Unscrew the four M8 nuts on the four threaded bolts (previously used
-
to block the anchor bolts) and leave a space of 15 mm between the
anchor plate and the base of the motor. Then insert the four washers
and allow them to rest on the nuts.
- Position the geared motor over the four threaded bolts and allow it to
rest on the four washers.
- Fasten it to the base using the other four washers and adjustment nuts
supplied with the kit, making sure that the unit remains perfectly level
and stable.
This will allow you to adjust the height and position of the motor later
on.
5
-
Fitting the toothed rack
- release the geared motor (fig. 8), lay the first stretch of the toothed rack
on the pinion and fix it to the gate, then fasten down all the other parts
along the entire length of the gate.
- after having fastened the toothed rack, realign the pinion (play of 1 to 2
mm between the toothed runner and the pinion) using the positioning
nuts at the base of the geared motor. This action will prevent the weight
of the sliding gate from damaging the unit when working.
Attention!
plate and the base of the motor.
6
2 mm
15 mm
5
15
70
15 mm between the anchor