Installation; Placing; Electrical Installation; Mains Voltage - ESAB Migmaster 280 Pro Manuel D'instructions

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

GB
Duty cycle
The duty cycle refers to the time as a percentage of a ten--minute period that you can weld at a cer-
tain load without overloading.
Enclosure class
The IP code indicates the enclosure class, i. e. the degree of protection against penetration by solid
objects or water. Equipment marked IP23 is designed for indoor and outdoor use.
Application class
The symbol
indicates that the power source is designed for use in areas with increased
electrical hazard.
5

INSTALLATION

The installation must be executed by a professional.
WARNING!
This product is intended for industrial use. In a domestic environment this product may cause radio
interference. It is the user's responsibility to take adequate precautions.
5.1

Placing

Position the welding power source such way that its cooling air inlets and outlets are
not obstructed.
5.2

Electrical installation

Mains voltage

All machines are factory configured for highest rated voltage and are fitted with appropriate marking
tape on the mains cable.
MMP280e
- - 7 - -

Publicité

Table des Matières
loading

Table des Matières