Description
1.
Hose connection for blowing
2.
On/off button (I/O)
3.
Hood with motor
4.
Hose connection for suction
5.
Boiler
6.
Wheel supports and wheels (3x)
Assembly
Remove all packaging material and keep out of the reach of children. After
removing the packaging, check that the device does not show any damage or
signs that could indicate an error/defect /malfunction. If in doubt, do not use the
device, but contact your supplier for inspection/replacement.
Open both clamps (10) and remove the motor cover (3) from the boiler (5).
The boiler contains the accessories: 3 wheel supports and wheels (6), hose (7)
and nozzle (8). Remove these accessories from the boiler.
Hold the boiler upside down and click the three wheel supports on the outer
edge at the bottom of the boiler. The positions where the three wheel supports
must be mounted are marked with labels on the bottom of the boiler.
7.
Hose
8.
Nozzle
9.
Fire prevention HEPA filter
10. Clamps (2x)
11. Electrical cable storage hooks
12. Handle
29