Non-Vented (Recirculating) Installation
1. Attach the air deflector to the upper horizontal support using
4 mounting screws.
B
A
A. Deflector
B. Mounting screws
2. Measure the length of 8" (20.3 cm) duct needed to connect
the transition to the deflector.
NOTE: Vent should fit up inside the deflector 1" (2.5 cm) minimum.
3. Install vent between the transition and the deflector.
NOTE: To make vent installation easier, temporarily remove
the deflector from the chimney support bracket and replace
after vent section is in place.
4. Seal all connections with vent clamps.
MAKE ELECTRICAL
CONNECTION
WARNING
Electrical Shock Hazard
Disconnect power before servicing.
Replace all parts and panels before operating.
Failure to do so can result in death or electrical shock.
1. Disconnect power.
2. Remove terminal box cover.
3. Remove the knockout in the terminal box and install a UL
listed or CSA approved ¹⁄₂" strain relief.
A. Knockout
B. Terminal box
C. Terminal box cover
8
B
A
B
C
4. Run home power supply cable through strain relief, into
terminal box.
A
C
D
E
A. Home power supply cable
B. UL listed or CSA approved
strain relief
C. Black wires
5. Use UL listed wire connectors and connect black wires (C)
together.
6. Use UL listed wire connectors and connect white wires (E)
together.
WARNING
Electrical Shock Hazard
Electrically ground blower.
Connect ground wire to green and yellow ground wire
in terminal box.
Failure to do so can result in death or electrical shock.
7. Connect green (or bare) ground wire from home power supply
to yellow-green ground wire (F) in terminal box using UL listed
wire connectors.
8. Tighten strain relief screw.
9. Install terminal box cover.
10. Check that all light bulbs are secure in their sockets.
11. Reconnect power.
B
F
D. UL listed wire connectors
E. White wires
F. Green (or bare) and yellow-
green ground wires