Installation; Lifting Instruction; Location - ESAB Caddy Mig C200i Manuel D'instructions

Masquer les pouces Voir aussi pour Caddy Mig C200i:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

US
4

INSTALLATION

The installation must be done by a professional.
Mains supply requirements
High power equipment may, due to the primary current drawn from the mains supply, influence the
power quality of the grid. Therefore connection restrictions or requirements regarding the
maximum permissible mains impedance or the required minimum supply capacity at the interface
point to the public grid may apply for some types of equipment (see technical data). In this case it
is the responsibility of the installer or user of the equipment to ensure, by consultation with the
distrubution network operator if necessary, that the equipment may be connected.
4.1

Lifting instruction

The power source is lifted by the handle or by the shoulder strap, supplied with the
power source. The strap is fastened as shown in the picture below.
4.2

Location

Position the welding power source such a way that its cooling air inlets and outlets
are not obstructed.
bc22a
- 12 -

Publicité

Table des Matières
loading

Table des Matières