6 Putting into operation
6.7 Connecting the control lead
1
Emergency-off
Fig. 5
Connecting the control lead
EN - 14
1
BN
WH
GN
2
The control lead is open on the machine side. The customer has to provide the
connection of a suitable plug. If all data are complete, everything will be
delivered ready for connection. Otherwise choose a compatible plug for your
power supply and solder it to the corresponding leads according to the
connection diagram.
2
1
3
WH
BN
GN
WH
BN
Sensor
®
ABITIG
WH