All manuals and user guides at all-guides.com
Preliminary operations
Take away the packing
•
Before installation, check the appliance integrity. In case of doubt, do not use the
•
appliance and call the dealer.
Packing materials is for recycle, getting it in the specify container
•
Appliance positioning
The installation room should have :
•
− A suitable floor for stove weight and calorific radiation, otherwise preventive measures
should be adopted. (i.e. Plate for charge distribution ).
− A suitable floor for stove calorific radiation to guarantee the building against any fire risk.
− The stove should be installed so that gas flue, chimney and cleaning could be easily done.
− A minimal distance from flammable materials ( Security Distances)
− A suitable ventilation as normative in force.
− It's prohibited to install the equipment into sleeping rooms, bathroom or where
another heating appliance ( without an independent air supply ) is installed.
− It's prohibited product positioning in environments with explosive atmosphere.
FLOOR PROTECTION
The equipment must be installed on a non–combustible surface. In case of flammable floor (as
wood, moquette, etc.) is necessary to prepare a protective base of the floor (sheet steel,
ceramic or other) with the following dimensions:
Hold up in front ≥ 500 mm;
−
Hold up lateral ≥ 300 mm;
−
Hold up back
−
SECURITY DISTANCES
From NOT combustible object :
•
A > 500 mm
−
From combustible object and from principal wall in
•
reinforced concrete :
A > 1000 mm
−
The minimal distance between the stove and every
•
objects over it must be at least 1 mt
≥ 100 mm
B > 100 mm
C > 100 mm
B > 200 mm
C > 200 mm
44/120
IT IT IT IT- - - - GB
GB- - - - FR
FR mod. Serie 698TP....
GB
GB
FR
FR