Télécharger Imprimer la page

Hilti HIT-HY 200-A Instructions D'utilisation page 10

Mortier de scellement pour ancrage de chevilles et d'armatures dans le béton.
Masquer les pouces Voir aussi pour HIT-HY 200-A:

Publicité

EN
Adhesive anchoring system for rebar and anchor fastenings in concrete.
Hilti HIT-HY 200-A
Contains: Hydroxypropylmetha-
crylat (A), 1,4-Butandiol-dimet-
hacrylat (A), Dibenzoylperoxid
(B)
Warning May cause an allergic skin reaction. (A, B) | Causes serious eye irritation. (B) | Very toxic to aquatic life with long
lasting effects. (B) | Do not get in eyes, on skin or on clothing. | Wear protective gloves/protective clothing/eye protection/
face protection. | IF ON SKIN: Wash with plenty of soap and water. | IF IN EYES: Rinse cautiously with water for several
minutes. Remove contact lenses, if present and easy to do. Continue rinsing. | If skin irritation or rash occurs: Get medical
advice/attention. | If eye irritation persists: Get medical advice/attention.
Disposal considerations: Empty packs: Leave the mixer attached and dispose of via the local Green Dot recovery system or
EAK waste material code: 150102 plastic packaging Full or partially emptied packs: Must be disposed of as special waste in
accordance with official regulations. EAK waste material code: 08 04 09* waste adhesives and sealants containing organic
solvents or other dangerous substances. or EAK waste material code: 20 01 27* paint, inks, adhesives and resins containing
dangerous substances.
Product Information: Always keep these instructions together with the product even when given to other persons. Material
Safety Data Sheet: Review the MSDS before use. Check expiration date: See imprint on foil pack manifold (month/year). Do not
use expired product. Foil pack temperature during usage: 0 °C to 40 °C / 32 °F to 104 °F. Base material temperature at time of
installation: HAS-U, HAS-D, HIT-V, HIS, Rebar: between -10 °C and 40 °C / 14 °F and 104 °F.; HIT-Z: between +5°C and 40°C /
41°F and 104°F. Conditions for transport and storage: Keep in a cool, dry and dark place between 5 °C and 25 °C / 41 °F and
77 °F. For any application not covered by this document / beyond values specified, please contact Hilti. Partly used foil packs
must remain in the cassette and has to be used within 4 weeks. Leave the mixer attached on the foil pack manifold and store
within the cassette under the recommended storage conditions. If reused, attach a new mixer and discard the initial quantity of
anchor adhesive.
Failure to observe these installation instructions, use of non-Hilti anchors, poor or questionable concrete conditions, or unique
applications may affect the reliability or performance of the fastenings.
NOTICE
The surface of the HIT-Z / HAS-D anchor rod must not be altered in any way. Moreover, the thread of HIT-Z must stay free
from dirt and dust during the installation procedure.
The HIT-Z cones must be fully embedded into mortar (especially at minimum embedment). Torque moment must always be
applied on HIT-Z nut and washer installed above a solid baseplate laying on concrete.
Improper handling may cause mortar splashes. Always wear safety glasses, gloves and protective clothes during installation.
| Never start dispensing without a mixer properly screwed on. | Attach a new mixer prior to dispensing a new foil pack
(ensure snug fit). | Use only the type of mixer (HIT-RE-M) supplied with the adhesive. Do not modify the mixer in any way. |
Never use damaged foil packs and/or damaged or unclean foil pack holders (cassettes).
Poor load values / potential failure of fastening points due to inadequate borehole cleaning. Hilti hollow drill bits TE-CD,
TE-YD must be used in conjunction with a properly maintained Hilti vacuum cleaner with model and suction capacity
(volumetric flow rate) as specified in the accessory table. | The boreholes must be free of debris, dust, water, ice, oil, grease
and other contaminants prior to adhesive injection. | For blowing out the borehole – blow out with oil free air until return
air stream is free of noticeable dust. | For flushing the borehole – flush with water line pressure until water runs clear. | For
brushing the borehole – only use specified wire brush. The brush must resist insertion into the borehole – if not the brush is
too small and must be replaced. | Important! Remove all water from the borehole and blow out with oil free compressed air
until borehole is completely dried before mortar injection (not applicable to hammer drilled hole in underwater application). |
Do not exceed the roughening time when roughening the drilled hole!
10
(A, B)
(B)
UFI: GW9R-EG2H-J71J-77TX (A) /
UFI: XGKR-1G37-6711-DD3D (B)

Publicité

loading