Télécharger Imprimer la page

GYS PORTASPOT 230 Mode D'emploi page 16

Masquer les pouces Voir aussi pour PORTASPOT 230:

Publicité

2.3 WELDING PROCEDURE
After powering up your welding station, please follow the instructions below:
Place the fixed welding arm on the sheet
to punch.
1
Action:
• Positioning of the clamp prior to welding.
Press the lever until you reach the mi-
croswitch.
Action:
2
• The sheets are closed between the elec-
trodes
• Current is passing through according to
the preset parameters.
Keep the pressure on the lever a few mo-
ments before releasing.
3
Action:
• Improves the mechanical properties of
the welding spot (forging).
WARNING ! The spot welding station is protected by an earth connection. Perform welding only if the
sheets to assemble are insulated from the earth! If not, immediately suspend the welding operation and
have a specialist check the earth connection and the installation of the welding station. This must be
done by a qualified person or an expert in the technical field.
2.4 DUTY CYCLE
Spotting with simple
impulsion in AUTO mode
0.6 mm + 0.6 mm
0.8 mm + 0.8 mm
1 mm + 1 mm
1.2 mm + 1.2 mm
1.5 mm + 1.5 mm
2 mm + 2 mm
Spotting with multiple
impulsions in AUTO mode
0.6 mm + 0.6 mm
0.8 mm + 0.8 mm
1 mm + 1 mm
1.2 mm + 1.2 mm
1.5 mm + 1.5 mm
2 mm + 2 mm
16
All manuals and user guides at all-guides.com
PORTASPOT 230
Number of spots before first thermal
protection activation
139
93
60
42
26
16
Number of spots before first thermal
protection activation
50
37
30
24
19
11
Number of spots between two thermal
protection activations
27
23
15
10
8
4
Number of spots between two thermal
protection activations
12
9
8
7
5
3
EN

Publicité

loading