Pipe 1
5
6
142
Pipe 2
Pipe 2
Pipe 1
Firstly, connect cables to the BMS;
Secondly, pull cables through pipes.
Pull the power cable (red) and heater cable
through pipe 1; pull the power cable (black),
communication cable and grounding cable
through pipe 2.
*Note: A corrugated pipe should be
prepared by the users themselves.
Insert pipes into the holes on
the cover, and then connect the
cables to the series box (See the
Step 4).