Télécharger Imprimer la page

SolaX Power X1-IES-A Serie Manuel D'installation page 131

Publicité

Wall Mounting / Wandmontage / Montage mural / Montaje en pared / Montagem na
parede / Wandmontage / Montaggio a parete / Montaż naścienny / Montáž na stěnu
/ Väggmontering / Montare pe perete / Стенен монтаж / Vægmontering / Στερέωση
σε τοίχο / Seinakinnitus / Seinäasennus / Montaža na zid / Fali szerelés / Montavimas
ant sienos / Sienas montāža / Montáž na stenu / Montaža na steno / Duvara montaj /
Montagem na parede / ‫التثبيت على الحائط‬
Take the installation procedure Option C (with 3 battery modules) as an example.
*Ensure that the bearing capacity of ground and the wall is greater than the weight of X1-
IES-A series. Otherwise, the wall mounting mode is not recommended.
One Tower
Step 1 Prepare and install the base and battery modules.
1
*Note: Remove dust covers from the base, battery module, and BMS before conducting installation.
Before installing, please refer to
the Step 1 of the Floor Mounting
to remove the dust covers.
Tighten screws on both sides.
2
128
Base
Battery module
BMS
M5*8
2.2-2.5 N·m

Publicité

loading

Ce manuel est également adapté pour:

X1-ies-3.7k-aX1-ies-5k-aX1-ies-6k-aX1-ies-8k-a