3/
Fixing the heated towel rail to the wall
1
Unfasten the carton's
flaps and place it
against the wall with
the lower flap folded
back and resting flat on
the floor. Prick out the
four drill holes though
the packaging (without
drilling) and then re-
move the packaging.
2
Carefully mark the
drilling points with a
pencil (draw a cross,
4cm wide).
Puissance
300 W
500 W
750 W
3
Drill the four holes.
Cote A
819 mm
1209 mm
1599 mm
4
Position the
four
and
them tight.
18
hooks
screw