5
Screw the sup-
ports onto the
tubes
without
blocking them.
Check their posi-
tion by putting
them with the
towel-drying ra-
diator into the
sheaths.
Once you found
the right position,
lock the screws
for each contact.
4/
Fitting and removing the hanger
1
Fit the base with the screw be-
hind the towel-drying radiator
in the wanted position.
2
Screw the hanger onto the
frame and tighten gently.
6
Fit the towel-
drying radiator
on the wall in
the sheaths.
Screw
down
each of the
locking blocks.
Put the caps
on the end of
the supports.
19
GB