1.3 Drainage hook installation
Prepare drainage hook, turn the concave buckle of the drainage hook downwards, then buckle it
down on the beam of the bed frame, see picture:
·
dr.hook
1.4 IV pole installation
Primary part installation: place the primary plastic hook part on top of the 16mm Ø stainless steel
pole and press it down.
Secondary part installation: place the secondary plastic hook part on top of primary, align the
secondary hook part's snap with the primary's socket and press it down, after you hear a "click"
sound, check if the clip is tight, if so, the installation is completed, if not, continue to press down.
Place IV pole vertically in one of the IV pole previsions.
7