Covering Installation - EdilKamin ARIS 8 Installation, Usage Et Maintenance

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 54
fi g. 1
C
fi g. 2
A
C
B
fi g. 3
D
D

COVERING INSTALLATION

A
B
A
B
B
1) VERSION WITH CERAMIC SIDES AND
TOP
Fig. 1
The stove is delivered (Fig. 1) with the following external com-
ponents already installed:
• metal rear sides (A)
• metal frames for fi xing the ceramic side elements (B)
• cast iron upper grille (C)
The pieces indicated below are packaged separately.
• 4 ceramic side elements (D - Fig. 3)
• 1 upper horizontal ceramic element (E - Fig. 7)
• 1 ceramic top (F - fi g. 9)
• 18 milled pins M4
• 18 washers
• 4 rubber pads (M)
To fi t proceed as follows:
Fig. 2
Remove the two metal rear sides (A) screwed onto the struc-
ture.
Remove the metal frames (B) by loosening the screws.
Remove the cast iron upper grille (C) screwed onto the struc-
ture.
Fig. 3
Attach the vertical ceramic elements (D) to the metal frames
(B) by inserting the M4 knurled bolts with washers provided
through the relevant slots.
- 38
-

Publicité

Table des Matières
loading

Table des Matières