Bolt-Through Mount
D - For installation on work surface with no access
for clamp system:
1
Drill 1/2" hole through work surface in desired
location.
NOTE: Bolt-Through Mount can accommodate a hole
up to 4" (102mm) in diameter. If hole is 2" (51mm) or
more, cables can be routed through the hole. For some
2"grommet holes, cables should be routed before
installation of mount to accommodate cable plugs
(cable access is
approximately 1.5" x 0.25" with 2" grommets).
2
Position the M8.1 Base over the work surface
hole (J).
3
Align Bolt-Through Plate, foam side up, under the
work surface. Pass the Bolt (K) through the hole in
the plate and screw into M8 base by using 8mm
hex key (L).
Smart Stop Adjustment
In each arm connection, there is an adjustable Smart Stop Ring which can be positioned to limit the arm's range of motion.
Depending on the orientation of the ring the arms can be set to rotate either 90°, 180°, or 360°. The marked angle will be in the
center of the range of motion.
②
4
①
③
④
⑤
J
J
K
L
Arm can rotate
without stopping
Arm can rotate 180˚
Arm can rotate 90˚