Télécharger Imprimer la page

Nice Yubii modules On/Off-Control2 Instructions Et Avertissements Pour L'installation Et L'utilisation page 3

Publicité

3
INSTALLATION
3.1 - Safety notes
Danger of electrocution!
• On/Off-Control2 is designed to operate in an electrical home installation. Faulty connection or use can result in a fire or electric shock.
• All works on the device can be performed only by a qualified and licensed electrician. Observe national regulations.
• Even when the device is turned off, voltage can be present at its terminals. Any maintenance introducing changes to the configuration of con-
nections or the load must be always performed with the disabled fuse.
• Connecting the device in a manner inconsistent with the manual can cause risk to health, life or material damage.
On/Off-Control2
Connect
• Connect only in accordance with one of the figures below.
• Don't bridge outputs with any kind of wiring. This can result in the permanent transmitter malfunction and/or the entire device
damage.
• The device should be installed in a wall switch box compliant with relevant national safety standards and with depth no less than 60 mm
• Electrical switches used in the installation should be compliant with relevant safety standards.
• Wires used to connect the control switch shouldn't be longer than 100 m.
On/Off-Control2
3.2 - Installation of
1. Switch off the mains voltage (disable the fuse).
2. Open the wall switch box.
3. Connect the device in accordance with with one of the following figures:
L
N
4. After verifying correctness of the connection, switch on the mains voltage.
5. Add the device to the Z-Wave network.
6. Turn off the mains voltage, then arrange the device in the wall switch box.
7. Close the wall switch box and turn on the mains voltage.
• S1 and S2 have the function of activating the leaning mode. You can activate the basic functionality of the device and activate the learning
mode (adding/removing). You can remove the device for 10 min. after powering it.
• The switch connected to the S1 terminal turns on/off the first load, and the switch connected to the S2 terminal turns on/off the second load.
• After switching on the mains voltage LED indicator signals the Z-Wave network inclusion state with a color:
GREEN - the device added to the non-secure, S0 or S2 Unauthenticated mode
MAGENTA - the device added to the S2 Authenticated mode
RED - the device not added
in accordance with the following rules:
PROG
3x CLICK TO
ADD/REMOVE
Figure 1: Single wall switch
L
N
Notes for the figures
S1 - Terminal for the 1
st
wall switch
S2 - Terminal for the 2
nd
wall switch
L - Terminal for the live lead
O1 - Output terminal of the 1
O2 - Output terminal of the 2
N - Terminal for the neutral lead
PROG - Service button (used to add/remove the device and navigate the menu)
Figure 2: Double wall switch
st
channel
nd
channel
PROG
3x CLICK TO
ADD/REMOVE
3

Publicité

loading